AiTenderBid
AI Tender and Bid Software for Contractors

Your AI Bid Team Prices the Tender. Your People Decide.

From the morning tender search to a priced BQ, risk registers, RFQs and programme, built for Malaysian contractors.

A Malaysian tender team, a QS, a project director and an estimator, reviewing an AI-priced bid in a site office overlooking a high-rise under construction in Kuala Lumpur
Tender total, sample bid
RM 48.61M
1,284 items priced
Issues raised with clause refs
57
6 registers
8 roles

AI engineer, QS, PM, contracts, QA/QC, HSE, planner and resources on every bid

64 reports

Priced BQ, registers, method statement, plans and forms, in English or 简体中文

07:00

Daily AI tender search across Malaysia and 10 more Southeast Asian countries

1 score per item

Every BQ item gets a rate, a remark, a source and a confidence score. Missing quantities are flagged, never guessed

A Tender Pack Is a Thousand Pages. The Deadline Is Two Weeks.

Most contractors bid the jobs they have time to price, not the jobs they could win. The hours go into reading, measuring, chasing quotes and formatting, long before anyone thinks about strategy.

  • Specifications, drawings, BQ, conditions and forms, read by hand and cross-checked by memory
  • Take-off repeated by the QS even when the BQ already prints quantities
  • Supplier quotes chased by phone, rates copied from last year's spreadsheet
  • LAD, bond and fluctuation clauses found the night before submission
  • Programme, method statement and HIRARC rewritten for every tender
A thick construction tender pack with specification volumes, drawings, a bill of quantities and a laptop on a desk

Watch One Tender Go From Advert to Priced Bid

The real screens, step by step. Click any step, or let it play.

aitenderbid.com/app / Bids
check_circleThe Open Web 14check_circleMyProcurement and ePerolehan 9 check_circleJKR, Federal and State 6check_circleState Agencies 5 check_circlePorts and Marine 2check_circleUtilities and GLCs 4 check_circleDevelopers and Private 11check_circleCIDB 1
Cadangan Membina Blok Kediaman 38 Tingkat, Cheras
Why it matches: G7 building works, Klang Valley, RM 40M to 60M, aluminium formwork in scope
Match
Naik Taraf Jalan Persekutuan FT050, Fasa 2
Why it matches: CE01 road works, Johor, est. RM 62M, 24 days to closing
Match
filter_alt
52 adverts read. 3 new matches added to Open. 49 skipped with the reason: grade, state, value, closing too soon, or "bumiputera sahaja".
Public › Tenders › Residential Tower A, Cheras6 filed
Notice of Tender.pdfNoticeFiled
Bill of Quantities, Blank.xlsxBill of QuantitiesFiled
Structural Drawings S-101 to S-338.pdfDrawingsFiled
Specification, Volume 2.pdfSpecificationFiled
Conditions of Contract.pdfTender DocumentFiled
Addendum 1.pdfAddendumFiled
Form of Tender (sold at the office)FormKept as link
Market PricesWeekly, 08:00
ItemUnitPreviousCurrentChange
Y-bar B500B, delivered Klang Valleyt2,700.002,850.00+5.6%
Ready-mix G40m3358.00365.00+2.0%
Ready-mix G35m3345.00350.00+1.4%
BRC A10 fabricm218.5018.500.0%
Aluminium formwork hire, slab soffitsm238.5040.00+3.9%
trending_up
Steel moved most this week. 2 open bids use Y-bar. Each price keeps its source, location and date, and goes into the Pricing Database history.
You
/prepare-bid  Tender folder: Public › Bids › Residential Tower A, Cheras
auto_awesome
Quick scan: 1,284 BQ items in SMM2 layout, 46 drawings, no section drawing found, aluminium formwork named, 3 amount formulas point at the wrong column. A similar bid exists: Residential Tower B, 2025.
Which rebar price level?
Mill / Delivered, about RM 2,350 to 2,800 per tonne (Recommended)CIDB AverageMy Supplier Quote
Floor-to-floor height? No section drawing was found.
3.15 m (Recommended)3.0 m3.3 m
Overheads and profit on the rates?
8% (Company Default)10%6%
Residential Tower A, CherasAnalyzing
Files Received53 files
Quick Scan1,284 BQ items
Your Answers9 answered
Reading Documents14 of 14 read
Drawing Takeoff46 drawing notes
Pricing1,284 priced
Issues57 issues
Programme and Resources112 activities
Quality, HSE and MethodDrafting HIRARC
Bid ReadyWaiting
Tender InfoBQResourcesTechnical ProposalIssuesTender SumSubmissionReports
RM 48.61MTender Total
1,284Items Priced
41Open Issues
3 wksBefore Completion
Share of tender value
Measured 71%Derived 18%Assumed 9%Missing 2%
auto_awesome
Top risks: uncapped LAD (CM-007), slab concrete short against drawings (QS-031), column C3 bar size unreadable (SE-014). Open questions are listed for the consultant.
Bill No. 2: FrameSearch Item, Ref, Description, Remark
ItemDescriptionUnitQtyRateAmountConf.
2/12 AGrade 40 concrete in columnsm31,846.00468.67865,164.8288
2/14 CHigh yield bar reinforcementt312.403,691.441,153,205.8660
2/16 BAluminium formwork to wallsm214,620.0038.88568,425.6090
2/15 EBRC A10 fabric, 15% lapsm22,150.0025.6855,212.0070
3/02 AHalf brick wall 110 mm, claym23,480.0073.44255,571.2070
2/22 DPVC waterstop to jointsm640.0034.5622,118.4045
2/12 A: Grade 40 concrete in columnsConfidence 88
Quantity 1,846.00 m3, measured from S-204 C1 and C2, L5 to L38measured
Ready-mix G40, RM 365.00 + 3% wastageMaterial375.95
Place, vibrate and cureLabour28.00
High-rise pumping, stationary pump and boomPlant30.00
Direct cost 433.95 x (1 + 8% OH&P)Rate468.67
auto_awesome
Suggested next questions: Is the G40 supplier quote under 180 days old? Should pumping above L30 use the extra-over rate? Are columns below L5 a different grade?
Basic PricesBasic PricesAllowancesMeasurements
Y-bar B500B supply, per tonne2,700.002,850.00
Source: supplier quote, Klang Valley, 12 days oldCurrent
sync
2/14 C reinforcement re-priced: rate 3,691.44 → 3,859.92, amount 1,153,205.86 → 1,205,839.01. Tender total + RM 52,633.15.
Ready-mix G40, per m3365.00
Aluminium formwork, walls, per m236.00
Overheads and profit8%
18Technical
11Commercial
14Contract
14Clarif., QA/QC, HSE
CM-007 LAD of RM 18,000 per day, uncapped
Conditions of Contract, Cl. 22.1, p. 31: "liquidated and ascertained damages at the rate of..."
High
CM-011 No price fluctuation provision for steel
Qualify the rebar rate or ask the Client. Draft clarification ready.
Medium
Estimator, 2 min ago
Client confirmed a 10% cap on LAD in Addendum 2.
task_alt
CM-007 resolved: LAD capped at 10% of the contract sum per Addendum 2, item 4. Risk allowance updated.
You
/update-bid  Addendum 2 and the Y-bar quote are in the folder
Update Plan, 3 linesWaiting for your reply
Qty2/12 A columns: 1,846.00 → 1,852.30 m3. S-204 rev B adds two columns at L38.Addendum 2
PriceY-bar B500B: 2,700.00 → 2,850.00 per tonne.Supplier quote
NoteCM-007: LAD capped at 10% of the contract sum.Addendum 2, item 4
You
Apply all three.
task_alt
Applied 3 of 3. No value had changed since the plan was written. Every change is in the log.
ReportsClient submissionInternal review
Bill of Quantities, Priced (xlsx)Ready
Bid Briefing for management (pptx)Ready
Issue Registers, 6 sheets (xlsx)Ready
Programme for MS Project (xml)Ready
Submission Checklist (xlsx)Partly filled: 2 forms unsigned
Tender totalRM 48,612,390.40

AiTenderBid walkthrough from tender search to reports: rebuilt from the live product on a sample bid. Figures are examples; the arithmetic is exact.

See the Full 20-Step Tour

Everything a Bid Needs, in One System

An AI Bid Team of Eight

Structural engineer, QS, project manager, contracts, QA/QC, HSE, planner and resources. Each role writes its own part and raises its own issues, numbered SE-001, QS-001 and so on.

A quantity surveyor checking an AI-priced bill of quantities against a floor plan on two monitors

Tenders Found for You Every Morning

Malaysia and Southeast Asia, filtered by CIDB grade, state, value and Bumiputera status. Documents downloaded and filed before you arrive.

A Priced BQ You Can Defend

Material, labour and plant build-up, measured or assumed, with a confidence score and a link back to the drawing.

Contract Risk

PWD 203A, PAM 2018, CIDB 2022 and FIDIC departures, clause by clause.

RFQs in One Click

A Word letter and a locked Excel schedule for each supplier.

Programme and Resources

CPM on a Malaysian calendar, histograms, MS Project export.

A safety and health officer inspecting scaffolding with a tablet on a Malaysian building site

QA/QC and HSE Drafted

Inspection and Test Plan, testing schedule, HIRARC on the DOSH matrix, Project Quality Plan, HSE plan and method statements adapted from your past submissions.

Auto-Price and Tender Sum

Basic prices from your own data, item review, manager approval.

People and Plant

Manpower, Machinery, Key Staff and Equipment registers.

64 Reports

Download or Generate, your own templates, English or 简体中文.

Site Progress

Progress reports, photos and an S-curve after you win.

Knowledge Base and PDF

Files filed for you, PDF forms filled by AI.

Contacts and Approvals

Plus Scheduled Jobs and desktop apps.

From Advert to Submission, Without the Late Nights

Find

Daily search, filtered to the tenders you can actually win.

Decide

Key facts, eligibility and similar past bids for the go or no-go.

Read

Every drawing and document read, every value cited.

Price

Independent take-off and full rate build-up.

Review

Issues and clarifications, answered in threads.

Draft

Programme, resources, ITP, HIRARC, briefing.

Submit

Priced BQ and reports, signed off by a person.

Who Does What, Before and After

The AI takes the repetitive hours. Judgement stays with your team.

How work is split between AiTenderBid and your team on a typical tender.
TaskBeforeAiTenderBid DoesYour Team Does
Find tendersChecking portals and newspapers by handSearches daily at 07:00, filters by grade, state and value, downloads documentsShortlists
Read the tender packDays of reading, key facts on sticky notesReads every page and drawing, lists requirements with page referencesConfirms the summary
Quantity take-offQS re-measures from drawingsIndependent take-off, flags differences over 5% against the BQChecks flagged items
Rate build-upCopied from old billsMaterial, labour and plant from your latest quotes, scored for confidenceAdjusts and locks rates
Contract reviewRead late, if at allClause by clause against standard forms, drafts clarificationsSets the commercial position
RFQs to suppliersLetters typed one by oneLetter and price schedule per supplier, no internal rates includedSends them
Programme and resourcesBuilt from scratch in a scheduling toolCPM programme, histograms, materials call-off, MS Project fileReviews logic
ITP, HIRARC, PQP, HSE planRewritten from old submissionsDrafted for this project, scored on the DOSH matrixApproves
SubmissionLast-minute formatting64 reports, ready or flagged with the reasonSigns off

Estimate the Hours for Your Team Compare With Spreadsheets and AI Chat

Aerial view of a highway viaduct under construction in Malaysia with a launching gantry on precast segments

Built for Malaysian Building and Civil Works

It reads the documents your tenders actually use, in the units and forms your QS already knows.

SMM2SMM3CESMM2MyCESMMNRM2PWD 203APAM 2018CIDB 2022FIDICCIDB G1 to G7OSHA 1994 and 2022FMA 1967BOWEC 1986DOSH HIRARCMS EN 12390-3Malaysian Public HolidaysRM and SST
  • High-rise residential, commercial and industrial buildings
  • Roads, bridges, rail and viaducts
  • Ports, jetties, dredging and revetment

People Approve. The AI Never Sends on Its Own.

Every change is planned, shown to you and applied only after you reply. Every save, AI edit and export is written to an append-only log.

  • Updates follow plan, confirm, apply. A value that changed since the plan is skipped, never overwritten
  • RFQs never carry your rates, amounts, markups or remarks
  • Locked BQ items never change
  • The AI never guesses an unreadable drawing value. It raises a question

How Control Works

A Malaysian project director standing on a completed floor slab at sunset, looking over the site

Questions Contractors Ask First

What is AiTenderBid?
AiTenderBid is AI tender and bid software for Malaysian construction contractors. It searches for tenders every morning, reads the tender pack, prices the Bill of Quantities with a confidence score on every item, raises contract and technical issues, drafts RFQs, builds the tender programme and resource plan, drafts the ITP and HIRARC, and exports 64 reports. People review and approve every step.
Does the AI replace my estimators and QS?
No. It takes over the reading, measuring, first-pass pricing and drafting, which is most of the hours in a tender. Your estimators and QS check the figures, decide the commercial position and sign off. Every number shows where it came from, so checking is fast.
Which measurement standards and contract forms does it know?
It detects SMM2, SMM3, CESMM2, MyCESMM and NRM2 in the BQ, and reviews Conditions of Contract against PWD 203A, PAM 2018, CIDB 2022 and FIDIC, flagging every departure with the clause and page.
Where do the rates come from?
In this order: your latest supplier quote in the Pricing Database, then your organisation rate, then a public price. A default Klang Valley rate library is included and labelled indicative, so you replace it with your own prices over time.
Can I try it on a real tender?
Yes. Start a free trial, upload one tender folder and type /prepare-bid. Or book a demo and we will run one of your past tenders so you can compare the result with your own priced bill.

All Questions

Price Your Next Tender with an AI Bid Team

Start a free trial and run one live tender through it, or book a demo and we will walk through one of yours.