Your AI Bid Team Prices the Tender. Your People Decide.
From the morning tender search to a priced BQ, risk registers, RFQs and programme, built for Malaysian contractors.

AI engineer, QS, PM, contracts, QA/QC, HSE, planner and resources on every bid
Priced BQ, registers, method statement, plans and forms, in English or 简体中文
Daily AI tender search across Malaysia and 10 more Southeast Asian countries
Every BQ item gets a rate, a remark, a source and a confidence score. Missing quantities are flagged, never guessed
A Tender Pack Is a Thousand Pages. The Deadline Is Two Weeks.
Most contractors bid the jobs they have time to price, not the jobs they could win. The hours go into reading, measuring, chasing quotes and formatting, long before anyone thinks about strategy.
- Specifications, drawings, BQ, conditions and forms, read by hand and cross-checked by memory
- Take-off repeated by the QS even when the BQ already prints quantities
- Supplier quotes chased by phone, rates copied from last year's spreadsheet
- LAD, bond and fluctuation clauses found the night before submission
- Programme, method statement and HIRARC rewritten for every tender

Watch One Tender Go From Advert to Priced Bid
The real screens, step by step. Click any step, or let it play.
| Item | Unit | Previous | Current | Change |
|---|---|---|---|---|
| Y-bar B500B, delivered Klang Valley | t | 2,700.00 | 2,850.00 | +5.6% |
| Ready-mix G40 | m3 | 358.00 | 365.00 | +2.0% |
| Ready-mix G35 | m3 | 345.00 | 350.00 | +1.4% |
| BRC A10 fabric | m2 | 18.50 | 18.50 | 0.0% |
| Aluminium formwork hire, slab soffits | m2 | 38.50 | 40.00 | +3.9% |
| Item | Description | Unit | Qty | Rate | Amount | Conf. |
|---|---|---|---|---|---|---|
| 2/12 A | Grade 40 concrete in columns | m3 | 1,846.00 | 468.67 | 865,164.82 | 88 |
| 2/14 C | High yield bar reinforcement | t | 312.40 | 3,691.44 | 1,153,205.86 | 60 |
| 2/16 B | Aluminium formwork to walls | m2 | 14,620.00 | 38.88 | 568,425.60 | 90 |
| 2/15 E | BRC A10 fabric, 15% laps | m2 | 2,150.00 | 25.68 | 55,212.00 | 70 |
| 3/02 A | Half brick wall 110 mm, clay | m2 | 3,480.00 | 73.44 | 255,571.20 | 70 |
| 2/22 D | PVC waterstop to joints | m | 640.00 | 34.56 | 22,118.40 | 45 |
AiTenderBid walkthrough from tender search to reports: rebuilt from the live product on a sample bid. Figures are examples; the arithmetic is exact.
Everything a Bid Needs, in One System
An AI Bid Team of Eight
Structural engineer, QS, project manager, contracts, QA/QC, HSE, planner and resources. Each role writes its own part and raises its own issues, numbered SE-001, QS-001 and so on.
Meet the Team

Tenders Found for You Every Morning
Malaysia and Southeast Asia, filtered by CIDB grade, state, value and Bumiputera status. Documents downloaded and filed before you arrive.
A Priced BQ You Can Defend
Material, labour and plant build-up, measured or assumed, with a confidence score and a link back to the drawing.
Contract Risk
PWD 203A, PAM 2018, CIDB 2022 and FIDIC departures, clause by clause.
RFQs in One Click
A Word letter and a locked Excel schedule for each supplier.
Programme and Resources
CPM on a Malaysian calendar, histograms, MS Project export.

QA/QC and HSE Drafted
Inspection and Test Plan, testing schedule, HIRARC on the DOSH matrix, Project Quality Plan, HSE plan and method statements adapted from your past submissions.
See QHSE
Auto-Price and Tender Sum
Basic prices from your own data, item review, manager approval.
People and Plant
Manpower, Machinery, Key Staff and Equipment registers.
64 Reports
Download or Generate, your own templates, English or 简体中文.
Site Progress
Progress reports, photos and an S-curve after you win.
Knowledge Base and PDF
Files filed for you, PDF forms filled by AI.
Contacts and Approvals
Plus Scheduled Jobs and desktop apps.
From Advert to Submission, Without the Late Nights
Find
Daily search, filtered to the tenders you can actually win.
Decide
Key facts, eligibility and similar past bids for the go or no-go.
Read
Every drawing and document read, every value cited.
Price
Independent take-off and full rate build-up.
Review
Issues and clarifications, answered in threads.
Draft
Programme, resources, ITP, HIRARC, briefing.
Submit
Priced BQ and reports, signed off by a person.
Who Does What, Before and After
The AI takes the repetitive hours. Judgement stays with your team.
| Task | Before | AiTenderBid Does | Your Team Does |
|---|---|---|---|
| Find tenders | Checking portals and newspapers by hand | Searches daily at 07:00, filters by grade, state and value, downloads documents | Shortlists |
| Read the tender pack | Days of reading, key facts on sticky notes | Reads every page and drawing, lists requirements with page references | Confirms the summary |
| Quantity take-off | QS re-measures from drawings | Independent take-off, flags differences over 5% against the BQ | Checks flagged items |
| Rate build-up | Copied from old bills | Material, labour and plant from your latest quotes, scored for confidence | Adjusts and locks rates |
| Contract review | Read late, if at all | Clause by clause against standard forms, drafts clarifications | Sets the commercial position |
| RFQs to suppliers | Letters typed one by one | Letter and price schedule per supplier, no internal rates included | Sends them |
| Programme and resources | Built from scratch in a scheduling tool | CPM programme, histograms, materials call-off, MS Project file | Reviews logic |
| ITP, HIRARC, PQP, HSE plan | Rewritten from old submissions | Drafted for this project, scored on the DOSH matrix | Approves |
| Submission | Last-minute formatting | 64 reports, ready or flagged with the reason | Signs off |
Estimate the Hours for Your Team Compare With Spreadsheets and AI Chat

Built for Malaysian Building and Civil Works
It reads the documents your tenders actually use, in the units and forms your QS already knows.
- High-rise residential, commercial and industrial buildings
- Roads, bridges, rail and viaducts
- Ports, jetties, dredging and revetment
People Approve. The AI Never Sends on Its Own.
Every change is planned, shown to you and applied only after you reply. Every save, AI edit and export is written to an append-only log.
- Updates follow plan, confirm, apply. A value that changed since the plan is skipped, never overwritten
- RFQs never carry your rates, amounts, markups or remarks
- Locked BQ items never change
- The AI never guesses an unreadable drawing value. It raises a question

Questions Contractors Ask First
What is AiTenderBid?
Does the AI replace my estimators and QS?
Which measurement standards and contract forms does it know?
Where do the rates come from?
Can I try it on a real tender?
Price Your Next Tender with an AI Bid Team
Start a free trial and run one live tender through it, or book a demo and we will walk through one of yours.