AiTenderBid
Bid Details

Every Rate, Every Reason, One Editor

The whole bid in eight tabs beside the AI chat, with build-ups, issues, approval and a full audit trail.

A Malaysian estimator reviewing a priced bill of quantities and drawings on two screens

Eight Tabs, One Bid

Familiar spreadsheet and document views, opened next to the AI Agent so you can ask and edit in the same place.

Tender Info

Overview, Documents, Eligibility, Go / No Go, Bid Plan, Requirements, Site Visit and Addenda.

BQ

Bill and Measurements: every item with quantity, build-up, amount and confidence.

Resources

Basic Prices with Auto-Price, All-in Rates and Quotations.

Technical Proposal

Method Statement, Programme, Resource Plan, Key Personnel and Plant.

Issues

Every issue, clarification and risk, from the AI team and the bid team, in one list.

Tender Sum

Tender Sum, Preliminaries, Qualifications, Arithmetic Check and Versions, then approval.

Submission

Forms and Envelopes, then the Post Tender record.

Reports

64 reports grouped by tab, each one Download or Generate.

The Bill, Column by Column

Fifteen columns, so the build-up behind every amount is on the same line as the amount.

Bill of Quantities columns in Bid Details.
ColumnWhat You See
Item, Ref, Description, UnitAs in the tender BQ, with the work section reference
QuantityLabelled measured, derived, assumed or missing, linked to the drawing note it came from
RateMaterial, labour and plant terms plus OH&P, rounded to two decimals
Material, Labour, PlantThe three cost terms, shown separately
Direct Cost, AmountCost before markup, and quantity times rate
ConfidenceGreen from 75, amber 50 to 74, red below 50
Remark, IssuesThe QS note and any open issues on the item
LockA locked item never changes

Search covers Item, Ref, Description and Remark. Right-click an item to insert or delete items, Excel style. Undo and redo go back 100 steps.

From Gate To Result

The steps a tender manager runs, each with its own view and report.

Eligibility

Registrations, certificates, insurance and bank facilities checked against closing plus validity, with the CIDB grade limit.

Go / No Go

Eight criteria scored, a recommendation and the recorded decision.

Bid Plan

Every task of the bid team with owner, dates and status.

Requirements

A Compliance Matrix: each tender requirement, where the bid answers it and any deviation.

Site Visit

Who attended, access, ground, utilities and risks.

Addenda

The latest addendum sets the closing date. Each one acknowledged and applied.

Measurements

Areas, counts and heights the quantities are built from, with source and confidence.

All-In Rates

Labour and plant rates per hour, day or unit, used in Basic Prices.

Arithmetic Check

Unpriced items, qty x rate, collections, Tender Sum, PC and Provisional Sums.

Versions

Every Tender Sum version, from tender to each round of negotiation.

Sum in Words

The Tender Sum in words, in English and Bahasa Malaysia, on every form.

Post Tender

Submitted, result, rank, competitors, revised sum and validity extension.

Sign-offs block a bid that is not ready: an expired certificate, a grade over the limit, a lapsed approval or a Form of Tender signed before approval.

aitenderbid.com/app / Bids
Bill No. 2: FrameSearch Item, Ref, Description, Remark
ItemDescriptionUnitQtyRateAmountConf.
2/12 AGrade 40 concrete in columnsm31,846.00468.67865,164.8288
2/14 CHigh yield bar reinforcementt312.403,691.441,153,205.8660
2/16 BAluminium formwork to wallsm214,620.0038.88568,425.6090
2/15 EBRC A10 fabric, 15% lapsm22,150.0025.6855,212.0070
3/02 AHalf brick wall 110 mm, claym23,480.0073.44255,571.2070
2/22 DPVC waterstop to jointsm640.0034.5622,118.4045
2/12 A: Grade 40 concrete in columnsConfidence 88
Quantity 1,846.00 m3, measured from S-204 C1 and C2, L5 to L38measured
Ready-mix G40, RM 365.00 + 3% wastageMaterial375.95
Place, vibrate and cureLabour28.00
High-rise pumping, stationary pump and boomPlant30.00
Direct cost 433.95 x (1 + 8% OH&P)Rate468.67
auto_awesome
Suggested next questions: Is the G40 supplier quote under 180 days old? Should pumping above L30 use the extra-over rate? Are columns below L5 a different grade?
18Technical
11Commercial
14Contract
14Clarif., QA/QC, HSE
CM-007 LAD of RM 18,000 per day, uncapped
Conditions of Contract, Cl. 22.1, p. 31: "liquidated and ascertained damages at the rate of..."
High
CM-011 No price fluctuation provision for steel
Qualify the rebar rate or ask the Client. Draft clarification ready.
Medium
Estimator, 2 min ago
Client confirmed a 10% cap on LAD in Addendum 2.
task_alt
CM-007 resolved: LAD capped at 10% of the contract sum per Addendum 2, item 4. Risk allowance updated.

Bill, justification and issues screens: rebuilt from the live product on a sample bid. Figures are examples; the arithmetic is exact.

Select an Item, See Why It Costs That

The Selected Item sidebar has three tabs.

Justification

The remark, quantity workings with clickable links to the drawing source, the rate build-up, the basic prices used, the confidence and your own Note.

Issues

Threads on the item, filtered by register: technical, commercial, contract, clarifications, QA/QC and HSE.

Logs

Every change to this item, who made it and when.

Change One Price, Re-Price the Bill

Live Re-Pricing

Change a figure on the Basic Prices tab and every item that uses it re-prices at once. Save keeps it. The browser model mirrors the server calculation line for line, so what you see is what gets saved.

Three Sub-Tabs

Basic Prices for materials and labour, Allowances such as wastage and OH&P, and Measurements such as floor-to-floor height.

Locks Hold

A locked item keeps its rate when everything around it moves.

Server Does the Maths

Totals and checks are computed, not written by the AI.

Quantity Check

In BQ, beside the bill.

Selected: C.4 Reinforcement Y16 (example)Conf. 60
auto_awesome
Questions to ask next
Is the rebar price delivered or ex-mill?
Does the quantity include laps and wastage?
Is fluctuation for reinforcement allowed in the contract?
Is there a newer supplier quote than the one used?

Four Questions, the Ones a QS Would Ask

Select an item or a cell and the AI proposes four short follow-up questions. Click one to ask it in the chat.

  • Suggestions are cached, so revisiting an item is instant
  • Up to 120 AI calls per hour
  • Rule-based questions take over when the AI is unavailable
  • The example on the left is an illustration, not a real bid

Auto-Price, Review and Tender Sum

Price fast, check every item, then approve one number.

Auto-Price

Matches each basic price to your latest supplier quote, organisation rate, market price or Manpower and Machinery rate. You see the match before it is used.

Review Status

Mark items Reviewed or Approved. A later change shows as Changed After Approval. Keys J, K and N step through what is left.

Tender Sum

Prelims, risk, overhead, profit, discount and rounding on top of the bill. Only a folder manager approves, and approval lapses if the sum changes.

Qualifications

Assumptions, exclusions, qualifications and clarifications in one list, printed into the Bid Summary.

Measurement Standards

SMM2, SMM3, CESMM2, MyCESMM and NRM2. Items sit in their work section and wrong units are flagged.

Ask AI

Send any item, price or ticked set to the chat. The AI plans the change, you confirm it.

Talk About the Number Next to the Number

Every BQ cell has its own thread: the whole item, description, unit, quantity, rate, amount, confidence and remark.

Threads per Cell

Reply, edit or delete your own messages, resolve and reopen. Messages appear for everyone within seconds. Up to 4,000 characters.

Files and Photos

Up to 10 files per message, 25 MB each, 120 uploads per person per hour. Camera photos show inline. Files are stored outside the web root.

AI Issues Are Threads

The AI reads your replies and closes an issue with its resolution. Knowledge Base links keep each reader's own rights.

Rights, Logs And Exports

Access Rights

Bid access follows the Knowledge Base folder the bid lives in. View opens the bid. Contribute saves changes. Open As opens it view-only, useful for checking what a colleague with fewer rights will see.

  • View opens
  • Contribute saves
  • Open As is view-only

Bid Details Questions

What is Bid Details?
An Excel and Word style editor that sits beside the AI chat. It holds the whole bid in eight tabs in workflow order: Tender Info, BQ, Resources, Technical Proposal, Issues, Tender Sum, Submission and Reports. Each tab has views, and every fact has one home.
Can the AI change an item I have locked?
No. Locked items never change, whether the edit comes from the AI Agent, a Refresh run or an /update-bid plan.
Who can open and edit a bid?
Access follows the Knowledge Base folder rights. View lets a person open the bid, Contribute lets them save, and Open As shows it view-only.
Can a reviewer reply without edit rights?
Yes. Anyone who can view the bid can post in a thread. Resolving a thread needs Contribute or Manage rights, or being a participant.
What is recorded in the log?
Every person save with each item whose figures moved and the new tender total, AI Agent edits, AI team runs, issue events, RFQs, Pricing Database saves, Excel exports, and an Opened entry once per person per 30 minutes. The log is append-only.
How many AI suggestions can I get?
Selecting an item or cell gives four short questions a QS would ask next. Suggestions are cached, limited to 120 AI calls per hour, and fall back to rule-based questions when needed.

Price Your Next Tender with an AI Bid Team

Try it on a tender you have already priced: the fastest way to judge it. A demo takes about 30 to 45 minutes.