AiTenderBid
Marine and Port Works

Jetties, Wharves and Dredging, Bid with Clarity

Port authority tenders, marine programme groups, plant planning and a risk list that covers the natural environment.

Aerial view of a concrete jetty on piles under construction, a crane on a piling barge driving a steel pile, a dredger and rock revetment at a Malaysian port

Marine Work Is a Default

Marine and port are in the default work types, and Ports and Marine Authorities is its own switchable source in the daily search.

MarinePortCivilBridgeRoadRailBuildingInfrastructure

Ports and Jetties

Jetty, wharf and berth construction and upgrading tenders from port and marine authorities.

Dredging

Capital and maintenance dredging packages, often with reclamation or disposal requirements.

Revetment and Shore Works

Rock revetments and coastal protection within port and marine packages.

aitenderbid.com/app · Bids
Tender OpportunitiesOpen 12Bidding 4Outcomes 31
Cadangan Membina Blok Kediaman 38 Tingkat, Cheras
Private developer · Kuala Lumpur · CIDB G7 · Closing in 19 days
Why it matches: high-rise RC frame, G7, Klang Valley, aluminium formwork named in the scope
Shortlisted
Naik Taraf Jalan Persekutuan FT050, Fasa 2
JKR Johor · CIDB G7 CE01 · Est. RM 62M · Closing in 24 days
Compulsory briefing Thu 10:00, kept and marked
New
Pembinaan Jeti dan Kerja Pengorekan, Pelabuhan Utara
Port authority · Penang · Est. RM 186M · 7 documents downloaded
Preparing
Supply of Ready-Mixed Concrete, Hospital Package B
Skipped: "Bumiputera sahaja" does not match your settings
Dismissed
Residential Tower A, CherasAnalyzing
Files Received53 files
Quick Scan1,284 BQ items
Your Answers9 answered
Reading Documents14 of 14 read
Drawing Takeoff46 drawing notes
Pricing1,284 priced
Issues57 issues
Programme and Resources112 activities
Quality, HSE and MethodDrafting HIRARC
Bid ReadyWaiting
Preliminary Tender ProgrammeCritical pathFinish 3 weeks before completion
Site possession
Bored piling
Pile caps, basement
Frame L1 to L38, 6-day cycle
Brickwork and plaster
M&E rough-in
Facade and windows
Finishes and fit-out
T&C, CCC

Opportunities, bid stages and programme screens: rebuilt from the live product on a sample bid. Figures are examples; the arithmetic is exact.

From the Notice To a Filed Pack

Each kept tender shows employer, location, scope, closing date, eligibility, estimated value and why it matches your settings.

  • Public documents downloaded by the server: notices, tender documents, BQ, drawings, specifications, addenda and forms
  • Up to 30 documents per tender, 50 MB each, with the real file type checked
  • Filed in the Knowledge Base under Public > Tenders > the tender title
  • Documents behind a login or sold only are kept as a link with the reason
  • Compulsory briefings kept and marked, or skipped, as you choose

Programme Groups for Marine Sequences

The Planner writes durations and links only. The server computes the dates, float and critical path.

Milestones and Preliminaries

Possession, mobilisation and key dates.

Marine Piling

Piling activities in their own group.

Dredging

Dredging activities and their links.

Revetment

Revetment and shore protection.

Completion

Testing, commissioning and handover.

Calendar with Malaysian public holidays, FS, SS, FF and SF links, lags and not-before dates. Finish is compared with contract completion. Exports to Excel with a Gantt and to MS Project XML.

Risks That Marine Bids Carry

The 80-risk Bid Risk List groups risks into nine categories. Four of them are usually discussed first on a marine package.

Natural Environment

Weather, sea and ground conditions that affect working windows and productivity.

Construction Technology

Methods and plant chosen for piling, dredging and revetment.

Laws and Regulations

Permits and statutory requirements named in the tender.

External Relations

Authorities, port operators and other parties the works depend on.

The other five: Country and Politics, Economy and Market, Design, Bid Proposal and Construction Organisation.

A planner reviewing a tender programme on screen

Plant, People And Contract Terms

Machinery Library

Lifting, Piling, Transport, Pumps and Air, Survey and Testing and more, owned or hired, up to 2,000 entries.

Manpower Library

Management, engineers, supervisors, skilled workers, operators and general workers, as direct hire, subcontract or labour agency.

Contract Review

Departures from FIDIC, PWD 203A, PAM 2018 and CIDB 2022, with LDs, bonds, insurances and time bars.

HSE

HIRARC on the DOSH matrix, an HSE plan framework and a Tender HSE Compliance Checklist.

Marine and Port Questions

Does the search find port and marine tenders?
Yes. Ports and Marine Authorities is one of the sources the daily search covers, and marine and port are among the default work types, together with civil, bridge, road, rail, building and infrastructure.
Can the programme show marine piling and dredging?
Yes. Civil and marine programmes use groups such as Marine Piling, Dredging and Revetment alongside Milestones, Preliminaries and Completion. The server computes dates by critical path method on a Malaysian working-day calendar.
Which measurement standards apply to marine bills?
Marine works are often measured in a civil engineering method. CESMM2 and MyCESMM are supported, together with SMM2, SMM3 and NRM2, and your interview answer overrides what is detected.
Does the risk list cover weather and sea conditions?
The 80-risk Bid Risk List includes a Natural Environment category, alongside Country and Politics, Economy and Market, Laws and Regulations, Design, Construction Technology, External Relations, Bid Proposal and Construction Organisation.
Can it plan marine plant?
Your Machinery library holds plant under categories such as Lifting, Piling, Transport, Pumps and Air and Other, owned or hired. Each bid line costs number x working days x rate per working day.

Bring Your Next Marine Tender to the Table

Start a free trial with one live package, or book a demo and we will walk through a jetty or dredging tender with you.