AiTenderBid
Product Tour

One Tender, Twenty Screens

The real AiTenderBid screens on a sample 38-storey residential tower bid. It plays on its own, or click any step.

aitenderbid.com/app / Bids
check_circleThe Open Web 14check_circleMyProcurement and ePerolehan 9 check_circleJKR, Federal and State 6check_circleState Agencies 5 check_circlePorts and Marine 2check_circleUtilities and GLCs 4 check_circleDevelopers and Private 11check_circleCIDB 1
Cadangan Membina Blok Kediaman 38 Tingkat, Cheras
Why it matches: G7 building works, Klang Valley, RM 40M to 60M, aluminium formwork in scope
Match
Naik Taraf Jalan Persekutuan FT050, Fasa 2
Why it matches: CE01 road works, Johor, est. RM 62M, 24 days to closing
Match
filter_alt
52 adverts read. 3 new matches added to Open. 49 skipped with the reason: grade, state, value, closing too soon, or "bumiputera sahaja".
Tender OpportunitiesOpen 12Bidding 4Outcomes 31
Cadangan Membina Blok Kediaman 38 Tingkat, Cheras
Private developer, Kuala Lumpur, CIDB G7, Closing in 19 days
Why it matches: high-rise RC frame, G7, Klang Valley, aluminium formwork named in the scope
Shortlisted
Naik Taraf Jalan Persekutuan FT050, Fasa 2
JKR Johor, CIDB G7 CE01, Est. RM 62M, Closing in 24 days
Compulsory briefing Thu 10:00, kept and marked
New
Pembinaan Jeti dan Kerja Pengorekan, Pelabuhan Utara
Port authority, Penang, Est. RM 186M, 7 documents downloaded
Preparing
Supply of Ready-Mixed Concrete, Hospital Package B
Skipped: "Bumiputera sahaja" does not match your settings
Dismissed
Public › Tenders › Residential Tower A, Cheras6 filed
Notice of Tender.pdfNoticeFiled
Bill of Quantities, Blank.xlsxBill of QuantitiesFiled
Structural Drawings S-101 to S-338.pdfDrawingsFiled
Specification, Volume 2.pdfSpecificationFiled
Conditions of Contract.pdfTender DocumentFiled
Addendum 1.pdfAddendumFiled
Form of Tender (sold at the office)FormKept as link
Market PricesWeekly, 08:00
ItemUnitPreviousCurrentChange
Y-bar B500B, delivered Klang Valleyt2,700.002,850.00+5.6%
Ready-mix G40m3358.00365.00+2.0%
Ready-mix G35m3345.00350.00+1.4%
BRC A10 fabricm218.5018.500.0%
Aluminium formwork hire, slab soffitsm238.5040.00+3.9%
trending_up
Steel moved most this week. 2 open bids use Y-bar. Each price keeps its source, location and date, and goes into the Pricing Database history.
You
/prepare-bid  Tender folder: Public › Bids › Residential Tower A, Cheras
auto_awesome
Quick scan: 1,284 BQ items in SMM2 layout, 46 drawings, no section drawing found, aluminium formwork named, 3 amount formulas point at the wrong column. A similar bid exists: Residential Tower B, 2025.
Which rebar price level?
Mill / Delivered, about RM 2,350 to 2,800 per tonne (Recommended)CIDB AverageMy Supplier Quote
Floor-to-floor height? No section drawing was found.
3.15 m (Recommended)3.0 m3.3 m
Overheads and profit on the rates?
8% (Company Default)10%6%
Residential Tower A, CherasAnalyzing
Files Received53 files
Quick Scan1,284 BQ items
Your Answers9 answered
Reading Documents14 of 14 read
Drawing Takeoff46 drawing notes
Pricing1,284 priced
Issues57 issues
Programme and Resources112 activities
Quality, HSE and MethodDrafting HIRARC
Bid ReadyWaiting
S-204 Typical Floor Column LayoutRead r1c1 to r3c3
L5 to L38Levels Covered
G40Column Grade
3.15 mFloor to Floor
48Columns per Floor
C1900 x 900, 16Y32, links Y10 at 150measured
C2800 x 800, 12Y25, links Y10 at 150measured
W1Shear wall 250 thick, core lift lobbyderived
help
SE-014 Open Question: Column C3 bar size is not readable at tile r2c3. Not guessed. Ask the consultant to confirm before submission.
Tender InfoBQResourcesTechnical ProposalIssuesTender SumSubmissionReports
RM 48.61MTender Total
1,284Items Priced
41Open Issues
3 wksBefore Completion
Share of tender value
Measured 71%Derived 18%Assumed 9%Missing 2%
auto_awesome
Top risks: uncapped LAD (CM-007), slab concrete short against drawings (QS-031), column C3 bar size unreadable (SE-014). Open questions are listed for the consultant.
Bill No. 2: FrameSearch Item, Ref, Description, Remark
ItemDescriptionUnitQtyRateAmountConf.
2/12 AGrade 40 concrete in columnsm31,846.00468.67865,164.8288
2/14 CHigh yield bar reinforcementt312.403,691.441,153,205.8660
2/16 BAluminium formwork to wallsm214,620.0038.88568,425.6090
2/15 EBRC A10 fabric, 15% lapsm22,150.0025.6855,212.0070
3/02 AHalf brick wall 110 mm, claym23,480.0073.44255,571.2070
2/22 DPVC waterstop to jointsm640.0034.5622,118.4045
2/12 A: Grade 40 concrete in columnsConfidence 88
Quantity 1,846.00 m3, measured from S-204 C1 and C2, L5 to L38measured
Ready-mix G40, RM 365.00 + 3% wastageMaterial375.95
Place, vibrate and cureLabour28.00
High-rise pumping, stationary pump and boomPlant30.00
Direct cost 433.95 x (1 + 8% OH&P)Rate468.67
auto_awesome
Suggested next questions: Is the G40 supplier quote under 180 days old? Should pumping above L30 use the extra-over rate? Are columns below L5 a different grade?
Basic PricesBasic PricesAllowancesMeasurements
Y-bar B500B supply, per tonne2,700.002,850.00
Source: supplier quote, Klang Valley, 12 days oldCurrent
sync
2/14 C reinforcement re-priced: rate 3,691.44 → 3,859.92, amount 1,153,205.86 → 1,205,839.01. Tender total + RM 52,633.15.
Ready-mix G40, per m3365.00
Aluminium formwork, walls, per m236.00
Overheads and profit8%
2,640Lowest Current
2,710Median
4Suppliers
11Quotes
Supplier A, Klang2,850.0012 days
Supplier B, Shah Alam2,640.0040 days
Supplier C, Rawang2,710.0095 days
Supplier D, Seremban2,560.00Stale, 214 days
AI Estimate2,700.00Kept apart
Quantity Check2 over 5%
ItemBQAI Take-OffDiff.
G40 concrete, columns (m3)1,846.01,852.3+0.3%
G35 concrete, slabs (m3)4,210.04,498.6+6.9%
Formwork to beams (m2)6,880.06,712.0-2.4%
Reinforcement (t)312.4331.8+6.2%
flag
QS-031 Commercial: slab concrete short by about 289 m3 against S-301 to S-338. Price at BQ quantity and qualify, or raise a tender query.
18Technical
11Commercial
14Contract
14Clarif., QA/QC, HSE
CM-007 LAD of RM 18,000 per day, uncapped
Conditions of Contract, Cl. 22.1, p. 31: "liquidated and ascertained damages at the rate of..."
High
CM-011 No price fluctuation provision for steel
Qualify the rebar rate or ask the Client. Draft clarification ready.
Medium
Estimator, 2 min ago
Client confirmed a 10% cap on LAD in Addendum 2.
task_alt
CM-007 resolved: LAD capped at 10% of the contract sum per Addendum 2, item 4. Risk allowance updated.
Supply of Grade 40 Ready-Mixed Concrete for Residential Tower ADraft
Scope of Supply: 6 items ticked from Bill No. 2Quantities from the bill
Commercial TermsPrices in Ringgit Malaysia (RM), excluding SST. Rates to include supply and delivery to site, unloading, and all wastage. Quotation valid for at least 60 days.
RFQ-0042 Supplier A.docx  +  RFQ-0042 Supplier A.xlsxcheck_circle
RFQ-0042 Supplier B.docx  +  RFQ-0042 Supplier B.xlsxcheck_circle
RFQ-0042 Supplier C.docx  +  RFQ-0042 Supplier C.xlsxcheck_circle
lock
Checked before writing: no internal rates, amounts, markups, confidence or remarks in any file.
You
/update-bid  Addendum 2 and the Y-bar quote are in the folder
Update Plan, 3 linesWaiting for your reply
Qty2/12 A columns: 1,846.00 → 1,852.30 m3. S-204 rev B adds two columns at L38.Addendum 2
PriceY-bar B500B: 2,700.00 → 2,850.00 per tonne.Supplier quote
NoteCM-007: LAD capped at 10% of the contract sum.Addendum 2, item 4
You
Apply all three.
task_alt
Applied 3 of 3. No value had changed since the plan was written. Every change is in the log.
Preliminary Tender ProgrammeCritical pathFinish 3 weeks before completion
Site possession
Bored piling
Pile caps, basement
Frame L1 to L38, 6-day cycle
Brickwork and plaster
M&E rough-in
Facade and windows
Finishes and fit-out
T&C, CCC
Manpower HistogramPeak 286 workers, month 14
Tower crane, 2 nos, on site month 4 to 22Hired
Aluminium formwork sets: order by week 9 for frame start week 21Lead 84 days
HIRARCITPTesting ScheduleHIRARC
No.HazardInitialResidual
HZ-001Fall from slab edge during formwork striking4 x 5 = 202 x 5 = 10
HZ-002Tower crane lift over occupied area3 x 5 = 151 x 5 = 5
HZ-003Concrete pump line burst at L30 and above3 x 3 = 92 x 3 = 6
gavel
Legal basis noted: OSHA 1994 and the 2022 amendments, FMA 1967, BOWEC 1986, DOSH guidelines and CIDB requirements.
ReportsClient submissionInternal review
Bill of Quantities, Priced (xlsx)Ready
Bid Briefing for management (pptx)Ready
Issue Registers, 6 sheets (xlsx)Ready
Programme for MS Project (xml)Ready
Submission Checklist (xlsx)Partly filled: 2 forms unsigned
Tender totalRM 48,612,390.40

Full AiTenderBid product tour: rebuilt from the live product on a sample bid. Figures are examples; the arithmetic is exact.

Every Step, in Words

The same tour as text, for reading at your own pace.

  1. 1

    AI Searches Tenders

    Nine sources, filtered to your grade. Every morning the AI searches nine sources, reads each advert, checks it against your CIDB grade, states, value range and Bumiputera status, and explains why each tender matches.

  2. 2

    Find the Tender

    Daily AI search, filtered to your grade. At 07:00 every day the AI searches MyProcurement, ePerolehan, JKR, state agencies, GLCs and private employers, rejects tenders you are not eligible for, and files the documents for you.

  3. 3

    Download the Pack

    Documents fetched, checked and filed. The server downloads each public tender document, checks it is a real file and not a web page, and files it in your Knowledge Base under Public, Tenders, then the tender title. Anything it cannot reach stays as a link with the reason.

  4. 4

    Track Market Prices

    Weekly AI check of the materials you watch. Every week at 08:00 the AI checks public sources for the materials your organisation monitors and records the current and previous price, source, location and date. The server calculates the change.

  5. 5

    Start with /prepare-bid

    A short interview, answers pre-picked. Attach the tender folder and type /prepare-bid. A quick scan reads the blank BQ first, then the AI asks only the questions it needs, with its recommended answer already picked.

  6. 6

    Watch the Bid Build

    Ten live stages, Files Received to Bid Ready. Eight AI roles work through the pack. Every stage shows its count as it happens, and a run that stalls is detected and flagged.

  7. 7

    Read Every Drawing

    Vision reads each sheet in 3 x 3 tiles. The Structural Engineer role reads each drawing page by page and tile by tile, writes a note per drawing, and never guesses a value it cannot read: it raises a question instead.

  8. 8

    Open the Bid Details

    The whole bid, Excel-style, beside the AI. Bid Details holds the whole bid in eight tabs beside the AI chat, in workflow order: tender info, BQ, resources, technical proposal, issues, tender sum, submission and reports. The summary shows how much of the value is measured, derived, assumed or missing.

  9. 9

    Price the BQ

    Every item priced and scored. Every BQ item gets a rate built from material, labour and plant, a remark, and a confidence score: green 75 and above, amber 50 to 74, red below 50.

  10. 10

    See Why Every Rate

    Rate build-up with source links. Click any item: the Justification shows the quantity workings with links into the drawing note, each basic price and where it came from, and the confidence of each part.

  11. 11

    Change One Price

    Every item that uses it re-prices at once. Change a basic price and every BQ item built on it re-prices instantly in the browser, using the same calculation as the server. Save keeps it and logs it.

  12. 12

    Keep Every Quote

    Supplier history, medians and stale flags. Every supplier price is kept, never overwritten. The item view shows the lowest current price, the median, every supplier across projects, and flags quotes older than 180 days.

  13. 13

    Check the Quantities

    Independent take-off against the BQ. Even when the BQ prints its own quantities, the AI measures independently. Any difference over 5% becomes a commercial issue before you price at the wrong number.

  14. 14

    Resolve the Issues

    Six registers, threads on every cell. Every risk, question and qualification lands in one of six registers with its document, page, clause and a short quote. Reply in the thread and the AI closes the issue with a resolution.

  15. 15

    Send RFQs

    Tick items, get a letter and schedule per supplier. Tick BQ items and press Create RFQ. The AI drafts the letter, you edit it, and the system writes one Word letter and one locked Excel price schedule per supplier. Your rates are never included.

  16. 16

    Apply an Addendum

    An Update Plan you approve first. With /update-bid the AI reads the addendum and writes an Update Plan: what changes, the current value read by the server, the proposed value, the reason and the source. Nothing changes until you reply.

  17. 17

    Build the Programme

    Critical path on a Malaysian calendar. The Planner writes activities, durations and links. The server calculates dates, float and the critical path on a working-day calendar with Malaysian public holidays, then exports Excel and MS Project.

  18. 18

    Plan the Resources

    Manpower and plant histograms. Labour and plant per activity become weekly histograms, peak numbers, a materials call-off with order-by dates and an organisation chart, all costed from your own library rates.

  19. 19

    Draft the QHSE

    ITP, HIRARC, PQP and HSE plan. HIRARC is scored on the DOSH 5 by 5 matrix by the server, which refuses a residual risk higher than the starting one. The ITP sets Hold, Witness, Surveillance and Review points.

  20. 20

    Download and Submit

    64 reports, one ZIP or one email. Tick the reports you need. Each one shows whether it is ready, partly filled or not possible yet, and why. Download as one ZIP or send by email: you choose what goes out.

Try It On Your Own Tender

Start a free trial, upload one tender folder and type /prepare-bid. Compare its priced bill with yours.

A project manager with a tablet on a construction site