Eight Specialists on Every Bid. None of Them Go Home.
Type /prepare-bid and an AI team turns your tender pack into a priced, reviewed bid with registers, programme and resources.

Who Is On the Team
Each role writes its own part of the bid and raises its own numbered issues, so you always know which discipline a question came from.
Structural Engineer
Reads every drawing by vision, page by page and in 3 x 3 tiles. Writes a note per drawing: title-block facts, levels, element schedule, key dimensions, assumptions, open questions. Never guesses an unreadable value.
Quantity Surveyor
Flags BQ errors first: wrong-column formulas, duplicate item letters, orphan items, mismatched units. Prices every item with a material, labour and plant build-up and labels each quantity measured, derived, assumed or missing.
Project Manager
Programme logic, formwork cycles, cranes, hoists and pumping, logistics and trade interfaces, the Technical Risk Register and method statements adapted from your past submissions.
Contracts and Commercial
Reads the Conditions of Contract clause by clause: LAD, bonds, retention, insurances, payment, fluctuation, EOT, time bars, indemnities, design liability and DLP.
QA/QC Engineer
Inspection and Test Plan, testing and inspection schedule and a nine-section Project Quality Plan framework.
HSE Officer
Tender HSE compliance checklist, major-hazard issues, HIRARC, safety methods and the HSE plan, referenced to OSHA, FMA, BOWEC and DOSH.
Planner
Writes 30 to 150 activities with durations and links. The server calculates dates and the critical path, and the Planner must fix a late finish honestly or raise it.
Resources Engineer
Labour and plant per activity, 10 to 25 key materials with lead times, and key personnel with qualifications.
Bid Lead
Writes the bid summary, tender information, submission checklist, 80-risk list and bid plan, then reports in plain English: total, finish date, how much is measured, top risks and open questions.
Start a Bid In One Command
Attach the tender folder to a task, type /prepare-bid and answer a short interview. Then watch it build.
| Item | Description | Unit | Qty | Rate | Amount | Conf. |
|---|---|---|---|---|---|---|
| 2/12 A | Grade 40 concrete in columns | m3 | 1,846.00 | 468.67 | 865,164.82 | 88 |
| 2/14 C | High yield bar reinforcement | t | 312.40 | 3,691.44 | 1,153,205.86 | 60 |
| 2/16 B | Aluminium formwork to walls | m2 | 14,620.00 | 38.88 | 568,425.60 | 90 |
| 2/15 E | BRC A10 fabric, 15% laps | m2 | 2,150.00 | 25.68 | 55,212.00 | 70 |
| 3/02 A | Half brick wall 110 mm, clay | m2 | 3,480.00 | 73.44 | 255,571.20 | 70 |
| 2/22 D | PVC waterstop to joints | m | 640.00 | 34.56 | 22,118.40 | 45 |
Starting a bid with /prepare-bid: rebuilt from the live product on a sample bid. Figures are examples; the arithmetic is exact.
The Interview Asks Only What Matters
Questions are built from what the scan found in your documents. Each one arrives with the AI's recommendation already selected.
| Question | Choices |
|---|---|
| A similar bid was found. Use its rates? | Use All Its Rates, Concrete and Rebar Only, No, Price Fresh |
| Which prices should the team use? | Current Quarter, Next Quarter (Escalated) |
| Which rebar price level? | Mill / Delivered, CIDB Average, My Supplier Quote |
| Method of measurement? | SMM2, SMM3, CESMM2, MyCESMM, NRM2 |
| Overheads and profit? | 8% (Company Default), 10%, 6% |
| Formwork system? | Aluminium (Mivan), Conventional Timber, Tableform |
| Site conditions? | Klang Valley Open, Klang Valley Confined, Outside Klang Valley |
| Working week? | Monday to Saturday, Monday to Friday, Seven Days |
| Wrong-column formulas found. Rewrite? | Yes, Rewrite Them, No, Keep the Originals |
Ten Live Stages
A run with no file written for 3 hours is detected as stalled and flagged as Needs Attention.
Three Ways To Work with the Team
Generate
The full run: read, measure, price, review and draft the whole bid from the tender pack.
Refresh
Reruns only the roles whose issues you answered, and reports the tender total before and after.
Work in the Open Bid
Ask in chat for one change, such as "re-rate pumping above level 30", and only that changes.
Facts, Never Invented
The team works under one rule: never fabricate a quantity or a drawing fact. Every issue taken from a document carries its reference.
- Document, page and clause on every issue, with a short quote under 40 words
- Every quantity labelled measured, derived, assumed or missing
- Unreadable values become open questions to the consultant, not guesses
- Severity is high when an item is over about 2% of the bill, affects LAD or safety

AI Bid Team Questions
What does /prepare-bid do?
How many questions does it ask?
Does the AI do the arithmetic?
What happens when the employer issues an addendum?
Does it learn from past bids?
Price Your Next Tender with an AI Bid Team
Try it on a tender you have already priced: the fastest way to judge it. A demo takes about 30 to 45 minutes.