AiTenderBid
Resources and Registers

Your People and Plant, in Every Bid

Rate libraries and real registers, costed on the programme and filled into the forms the employer asks for.

A site supervisor checking an equipment list beside excavators and a mobile crane in a Malaysian plant yard

Four Lists, Two Apps

Each app has Rates and a Register.

Manpower Rates

Management, engineers, supervisors, skilled workers, operators and general workers. Overtime, grade and certification.

Machinery Rates

Earthmoving, lifting, concrete, piling, paving, transport, access, power, survey and small tools. Capacity, operator, fuel and mobilisation.

Key Staff

Qualifications, years of experience, nationality, present employment and past projects.

Equipment Register

Every unit you own: serial number, model, status and condition.

From Library to Bid Forms

Import

Excel or CSV, English or Chinese headers, checked first.

Cost

Resources lines costed on the programme working days.

Price

Basic Prices per hour or day filled from the library.

Report

Key personnel, plant, man-months and org chart.

Reports Filled from Your Registers

ReportFormatFilled From
Proposed Key PersonnelExcelKey Staff, head office and site
Proposed Plant and EquipmentExcelEquipment Register units, the rest To Be Hired
Manpower Man-Month TabulationExcelKey roles per month over the programme
Organisation ChartExcel and PowerPointRoles with the person proposed
Manpower Schedule and HistogramExcelBid resources over the programme
Plant and Machinery Schedule and HistogramExcelBid plant over the programme
Resource PlanExcel and WordHistograms, cost and materials call-off
Manpower and Machinery Libraries, Staff and Equipment RegistersExcelThe Reports app

Your own key personnel or plant form can be uploaded as the template.

Resources Questions

What is the difference between Manpower and Machinery?
They are two separate apps. Manpower holds your trades and roles with rates per hour, day, week or month, sourced as Direct Hire, Subcontract or Labour Agency. Machinery holds your plant, Owned or Hired, in categories from Earthmoving and Lifting to Survey and Testing. Each holds up to 2,000 entries.
How do library rates reach a bid?
In Bid Details, Resources adds lines from Manpower and Machinery and costs them on the programme: number times working days times the rate per working day. Basic Prices priced per hour or day can be filled From Manpower or Machinery. The rate is frozen on the bid, and Use is offered when the library rate changes.
What are Key Staff and the Equipment Register?
Registers of your real people and your real machines. Key Staff holds qualifications, experience, nationality and past projects. The Equipment Register holds each unit with serial number, model, status and condition. Bid reports such as Proposed Key Personnel and Proposed Plant and Equipment are filled from them.
Can I import my existing lists?
Yes. Upload Excel or CSV. Headers are found by their words, in English or Chinese, and you see a check before anything is saved. Re-importing only changes the mapped columns.

Price Your Next Tender with an AI Bid Team

Try it on a tender you have already priced: the fastest way to judge it. A demo takes about 30 to 45 minutes.