Contract Risk

Find the Uncapped LAD Before You Sign, Not After

Every clause compared with PWD 203A, PAM 2018, CIDB 2022 and FIDIC, each departure flagged with its page and wording.

A neatly prepared construction tender submission with sealed envelopes, bound volumes and a signed form

Clause by Clause, Nothing Skimmed

LAD and Delay

Rate, cap and how it compares with the standard form.

Bonds and Retention

Bid bond, performance bond, retention and release.

Insurances

CAR, public liability, workmen and professional indemnity.

Payment

Interim valuation, payment period and set-off.

Fluctuation

Whether steel and other materials are fixed or adjustable.

EOT and Variations

Grounds, notice periods and valuation rules.

Claims and Time Bars

Deadlines that can extinguish a claim.

Design Liability and DLP

Contractor design, indemnities and defects period.

Six Registers, One Workbook

Open issues first, then by severity. Every line carries its reference, its action and the BQ items it touches.

Technical Register

Drawing gaps, missing sections, buildability, formwork cycles, crane and hoist limits, trade interfaces.

Raised by: SE, PM, EN

flag
Example
SE-014 Column C3 bar size not readable on S-204. Ask the consultant.
aitenderbid.com/app · Bids
18Technical
11Commercial
14Contract
14Clarif., QA/QC, HSE
CM-007 LAD of RM 18,000 per day, uncapped
Conditions of Contract, Cl. 22.1, p. 31: "liquidated and ascertained damages at the rate of..."
High
CM-011 No price fluctuation provision for steel
Qualify the rebar rate or ask the Client. Draft clarification ready.
Medium
Estimator, 2 min ago
Client confirmed a 10% cap on LAD in Addendum 2.
task_alt
CM-007 resolved: LAD capped at 10% of the contract sum per Addendum 2, item 4. Risk allowance updated.
You
/update-bid  Addendum 2 and the Y-bar quote are in the folder
Update Plan, 3 linesWaiting for your reply
Qty2/12 A columns: 1,846.00 → 1,852.30 m3. S-204 rev B adds two columns at L38.Addendum 2
PriceY-bar B500B: 2,700.00 → 2,850.00 per tonne.Supplier quote
NoteCM-007: LAD capped at 10% of the contract sum.Addendum 2, item 4
You
Apply all three.
task_alt
Applied 3 of 3. No value had changed since the plan was written. Every change is in the log.
Quantity Check2 over 5%
ItemBQAI Take-OffDiff.
G40 concrete, columns (m3)1,846.01,852.3+0.3%
G35 concrete, slabs (m3)4,210.04,498.6+6.9%
Formwork to beams (m2)6,880.06,712.0-2.4%
Reinforcement (t)312.4331.8+6.2%
flag
QS-031 Commercial: slab concrete short by about 289 m3 against S-301 to S-338. Price at BQ quantity and qualify, or raise a tender query.

Issues, Update Plan and Quantity Check screens: rebuilt from the live product on a sample bid. Figures are examples; the arithmetic is exact.

Discuss It Where the Number Lives

Every BQ cell and every AI issue has its own thread, so a question about a rate sits next to that rate.

  • Reviewers can comment without the right to change figures
  • Up to 10 attachments per message, 25 MB each, camera photos shown inline
  • Knowledge Base links keep the reader's own access rights
  • The AI reads replies and closes the issue with a written resolution
  • Clarification wording ready to paste into a tender query letter

Addenda Without the Rework Panic

/update-bid applies a drawing revision, BQ addendum, specification change or supplier quote through a plan you approve.

Attach the Addendum

Drawings, BQ pages, specification or a quote.

Read the Update Plan

Each line: what changes, current value, proposed value, reason and source.

Reply to Approve

Up to 300 lines, valid for 7 days.

Applied and Logged

Any value that moved since the plan is skipped and reported, never overwritten.

Contract Risk Questions

Which contract forms does it compare against?
PWD 203A, PAM 2018, CIDB 2022 and FIDIC. The Contracts role reads the Conditions of Contract clause by clause and flags every departure from the standard form with the clause, page and a short quote.
What does the contract review cover?
Liquidated damages, bonds, retention, insurances (CAR, public liability, workmen and professional indemnity), payment, fluctuation, extension of time and variations, claims and time bars, indemnities, design liability and the defects liability period. It also reviews risk-transfer wording in the preambles, provisional and PC sums, named products and drafts your qualifications and exclusions.
What are the six issue registers?
Technical, Commercial, Contract, Clarifications, QA/QC and HSE. Each issue has a severity, a type (risk, action, question, qualification or note), who to ask (you, the consultant, the client or a supplier), the document reference, the proposed action and the BQ items it affects.
Can my team discuss issues in the system?
Yes. Every BQ cell and every issue has a thread. Anyone who can view the bid can comment, so reviewers do not need edit rights. Messages appear for everyone within seconds, can carry up to 10 files of 25 MB each, and the AI reads replies and closes an issue with its resolution.
Is there an audit trail?
Yes, an append-only log. It records every save with every row whose figures moved and the new tender total, every AI edit and team run, every issue event, RFQ, Pricing Database save and export, and who opened the bid.

Price Your Next Tender with an AI Bid Team

Try it on a tender you have already priced: the fastest way to judge it. A demo takes about 30 to 45 minutes.