64 Reports, One ZIP, No Formatting Nights
Priced BQ, registers, method statement, programme, plans and forms. Each one Download or Generate, in English or 简体中文.

Every Report in the System
Bill of Quantities, Priced
The original BQ filled in with your rates, ready for the client
Bill of Quantities, Internal Review
With confidence, rate build-up, remarks, open issues, rate analysis and basic prices
Bill of Quantities, Quantities Only
No prices: for subcontractors and suppliers
Bids Overview
One line per bid: total, confidence, what is left open
Bill Summary
Collection and summary: every bill and part, items, priced, amount and share of the total
Cost Breakdown
Material, labour, plant, direct cost and OH&P per bill and part
Major Items (80/20)
Items by value with the running share: the few that make 80% of the price
Basic Prices Schedule
Every price and allowance the bill is built from: value, source, confidence, items using it
Pricing Sources and Confidence
Where every rate came from and how sure it is, with a summary by source
Supplier Price Comparison
Each basic price against every supplier's latest quote in the Pricing Database
Review Status
Every item To Review, Reviewed or Approved (and changed after review), when, and its rate source
Measurements Schedule
Areas, counts, heights and ratios the quantities are built from: figure, unit, confidence and source
All-In Rates
Labour and plant all-in rates and materials with waste: every input and the rate per hour, day or unit
Preliminaries Build-Up
Every Preliminaries line by group: basis, quantity, months, rate and amount
Arithmetic Check
Unpriced items, qty x rate, collections, Tender Sum, PC and Provisional Sums, with each item
Bid Summary
Scope, key dates, submission, quantities, conditions, price and main risks
Bid Briefing
The same facts as management slides
Assumptions, Exclusions and Qualifications
What the price assumes, leaves out or qualifies, and the clarifications still open
Tender Price Review
For approval: total, breakdown, OH&P, confidence, review progress, major items, risks and sign-off
Bid Strategy Deck
Bid kick-off and strategy meeting: project, client needs, competitors, risks and key difficulties, subcontract and procurement plan, strategy and more
Tender Executive Summary
For management: price, programme and the technical, commercial, contract, safety and programme risks that need attention
Go / No Go Assessment
The eight criteria scored, the recommendation and the recorded decision
Bid Plan
Who does what by when: every task of the bid team with owner, dates and status
Tender Sum
How the Tender Sum is built, from Bill Total to rounding, and its approval
Tender Sum Versions
Every saved version of the Tender Sum with its figures and approval
Post Tender Record
Result, rank, competitors and gap, the post tender timeline and lessons
Tender Information
About 70 fields in English and Chinese: project summary, bid plan and bid team
Submission Checklist
Every returnable document, its requirement, who and when
Bid Risk List
The 80 standard risks in 9 categories, with this bid's description and response
Issue Registers
The AI team's issues, one sheet per register
Quantity Check
Every BQ quantity against the drawings
Technical Risk Register
Technical issues and tender requirements: document, page and clause, impact and proposed action or clarification
Commercial Risk Register
Quantity discrepancies, provisional items, price fluctuation, major cost items and other commercial risks
Contract Risk Register
LD, bonds, insurance, payment, EOT, variations, claims, notices, indemnity and design liability, by clause
Tender Clarification List
Questions for the consultant or Employer before submission: clause, issue, risk and proposed clarification
Tender Clarification List
The same clarification list as a Word document, ready to send
BQ Discrepancy Report
Missing items, possible under- and over-measurement and unclear measurement basis
Addenda Register
Every addendum: number, date, what it changes, acknowledged and applied
Compliance Matrix
Every tender requirement, where the bid answers it and whether it complies
Eligibility Checklist
Registrations, certificates, insurance and bank facilities with expiry, and the CIDB grade check
Issue Log
Every issue, clarification and risk from the AI team and the bid team, with owner, due date and status
Programme
Gantt chart with the critical path
Programme for MS Project
Opens in Microsoft Project
Resource Plan
Manpower and plant histograms, materials call-off
Resource Plan
The resource plan as a Word report
Organisation Chart
Key personnel and who reports to whom
Detailed Work Programme
Technical submission of the programme: planning basis, WBS, calendar, activity codes, milestones, weightage, productivity, work sequence, assumptions and more
Construction Method Statement
Tender technical proposal: document control and basis, project understanding and overall methodology and more
Proposed Key Personnel
The bid's key people, head office and site: qualification, experience, proposed position, nationality, present employment, past projects
Proposed Plant and Equipment
The bid's plant with the organisation's own units from the Equipment Register (serial number, model, status, condition), the rest to be hired
Manpower Man-Month Tabulation
Each key role, the people in every month of the programme and the total man-months, with the manpower curve
Organisation Chart (Excel)
Head office and site organisation: every role with the person proposed from Key Staff
Manpower Schedule and Histogram
Management, engineers, supervisors, skilled workers, operators and general workers over the programme
Plant and Machinery Schedule and Histogram
Equipment type, number, deployment period and work area over the programme
Site Visit Report
Who attended, certificate, access, ground, utilities, existing structures and risks
Technical Proposal Sections
The sections of the technical proposal with owner, status and score
Inspection and Test Plan
Hold, witness and review points
Testing Schedule
Tests, frequencies and standards
HIRARC
Hazards, risk scores and controls
Project Quality Plan
Quality plan for submission: project information, quality objectives, organisation, resources, inspection and testing, method statements and ITP
HSSE Plan
Health, Safety, Security and Environment plan for submission: objectives, organisation, major hazards and HIRARC, site rules and more
QA/QC Requirement and Risk Register
Unusual or stringent quality requirements with the specification reference and the control action
Tender HSE Compliance Checklist
Mandatory plans, personnel, permits, procedures, reporting and training the tender requires
Activity-Based Safety Methods
Safety method and control measures for lifting, excavation, piling, marine works, work at height and traffic
| Item | Description | Unit | Qty | Rate | Amount | Conf. |
|---|---|---|---|---|---|---|
| 2/12 A | Grade 40 concrete in columns | m3 | 1,846.00 | 468.67 | 865,164.82 | 88 |
| 2/14 C | High yield bar reinforcement | t | 312.40 | 3,691.44 | 1,153,205.86 | 60 |
| 2/16 B | Aluminium formwork to walls | m2 | 14,620.00 | 38.88 | 568,425.60 | 90 |
| 2/15 E | BRC A10 fabric, 15% laps | m2 | 2,150.00 | 25.68 | 55,212.00 | 70 |
| 3/02 A | Half brick wall 110 mm, clay | m2 | 3,480.00 | 73.44 | 255,571.20 | 70 |
| 2/22 D | PVC waterstop to joints | m | 640.00 | 34.56 | 22,118.40 | 45 |
Reports screen: rebuilt from the live product on a sample bid. Figures are examples; the arithmetic is exact.
Four Download Presets
Confidence colours in the export: green 75% and above, amber 50% to 74%, red below 50%.
One Reports App for Every App
By app, by project, or from history.
By App
Bids, Tender Opportunities, Pricing Database, Manpower, Machinery, Site Progress and Contacts.
By Project
Readiness of every report for a bid, then Download All Ready.
History
What was made, by whom and when, with Run Again.
Scheduled
Data reports emailed on a schedule, up to 10 recipients.
Your Templates
Upload your own Excel or Word form per report. The server fills it and keeps your layout.
English or 简体中文
Whole files translated, company name in the right language.
What Is Missing
Each report says Ready, Partly Filled or Not Available, and why.
Bid Results
Record Won or Lost and the awarded value. See hit rate and won value.
The 80-Risk List, in Nine Categories
A standard bid risk list assessed against this tender, ready for the management meeting.
Full Report List
| Group | Report | Format | Button | Contents |
|---|---|---|---|---|
| Bill of Quantities | Bill of Quantities, Priced | Excel | Download | The original BQ filled in with your rates, ready for the client |
| Bill of Quantities | Bill of Quantities, Internal Review | Excel | Download | With confidence, rate build-up, remarks, open issues, rate analysis and basic prices |
| Bill of Quantities | Bill of Quantities, Quantities Only | Excel | Download | No prices: for subcontractors and suppliers |
| Bill of Quantities | Bids Overview | Excel | Download | One line per bid: total, confidence, what is left open |
| Pricing and Review | Bill Summary | Excel | Download | Collection and summary: every bill and part, items, priced, amount and share of the total |
| Pricing and Review | Cost Breakdown | Excel | Download | Material, labour, plant, direct cost and OH&P per bill and part |
| Pricing and Review | Major Items (80/20) | Excel | Download | Items by value with the running share: the few that make 80% of the price |
| Pricing and Review | Basic Prices Schedule | Excel | Download | Every price and allowance the bill is built from: value, source, confidence, items using it |
| Pricing and Review | Pricing Sources and Confidence | Excel | Download | Where every rate came from and how sure it is, with a summary by source |
| Pricing and Review | Supplier Price Comparison | Excel | Download | Each basic price against every supplier's latest quote in the Pricing Database |
| Pricing and Review | Review Status | Excel | Download | Every item To Review, Reviewed or Approved (and changed after review), when, and its rate source |
| Pricing and Review | Measurements Schedule | Excel | Download | Areas, counts, heights and ratios the quantities are built from: figure, unit, confidence and source |
| Pricing and Review | All-in Rates | Excel | Download | Labour and plant all-in rates and materials with waste: every input and the rate per hour, day or unit |
| Pricing and Review | Preliminaries Build-up | Excel | Download | Every Preliminaries line by group: basis, quantity, months, rate and amount |
| Pricing and Review | Arithmetic Check | Excel | Download | Unpriced items, qty x rate, collections, Tender Sum, PC and Provisional Sums, with each item |
| Management | Bid Summary | Word | Generate | Scope, key dates, submission, quantities, conditions, price and main risks |
| Management | Bid Briefing | PowerPoint | Generate | The same facts as management slides |
| Management | Assumptions, Exclusions and Qualifications | Word | Generate | What the price assumes, leaves out or qualifies, and the clarifications still open |
| Management | Tender Price Review | Word | Generate | For approval: total, breakdown, OH&P, confidence, review progress, major items, risks and sign-off |
| Management | Bid Strategy Deck | PowerPoint | Generate | Bid kick-off and strategy meeting: project, client needs, competitors, risks and key difficulties, subcontract and procurement plan, strategy and more |
| Management | Tender Executive Summary | Word | Generate | For management: price, programme and the technical, commercial, contract, safety and programme risks that need attention |
| Management | Go / No Go Assessment | Excel | Download | The eight criteria scored, the recommendation and the recorded decision |
| Management | Bid Plan | Excel | Download | Who does what by when: every task of the bid team with owner, dates and status |
| Management | Tender Sum | Excel | Download | How the Tender Sum is built, from Bill Total to rounding, and its approval |
| Management | Tender Sum Versions | Excel | Download | Every saved version of the Tender Sum with its figures and approval |
| Management | Post Tender Record | Excel | Download | Result, rank, competitors and gap, the post tender timeline and lessons |
| Bid Forms | Tender Information | Excel | Generate | About 70 fields in English and Chinese: project summary, bid plan and bid team |
| Bid Forms | Submission Checklist | Excel | Generate | Every returnable document, its requirement, who and when |
| Bid Forms | Bid Risk List | Excel | Generate | The 80 standard risks in 9 categories, with this bid's description and response |
| Commercial | Issue Registers | Excel | Download | The AI team's issues, one sheet per register |
| Commercial | Quantity Check | Excel | Download | Every BQ quantity against the drawings |
| Commercial | Technical Risk Register | Excel | Generate | Technical issues and tender requirements: document, page and clause, impact and proposed action or clarification |
| Commercial | Commercial Risk Register | Excel | Generate | Quantity discrepancies, provisional items, price fluctuation, major cost items and other commercial risks |
| Commercial | Contract Risk Register | Excel | Generate | LD, bonds, insurance, payment, EOT, variations, claims, notices, indemnity and design liability, by clause |
| Commercial | Tender Clarification List | Excel | Generate | Questions for the consultant or Employer before submission: clause, issue, risk and proposed clarification |
| Commercial | Tender Clarification List | Word | Generate | The same clarification list as a Word document, ready to send |
| Commercial | BQ Discrepancy Report | Excel | Generate | Missing items, possible under- and over-measurement and unclear measurement basis |
| Commercial | Addenda Register | Excel | Download | Every addendum: number, date, what it changes, acknowledged and applied |
| Commercial | Compliance Matrix | Excel | Download | Every tender requirement, where the bid answers it and whether it complies |
| Commercial | Eligibility Checklist | Excel | Download | Registrations, certificates, insurance and bank facilities with expiry, and the CIDB grade check |
| Commercial | Issue Log | Excel | Download | Every issue, clarification and risk from the AI team and the bid team, with owner, due date and status |
| Planning | Programme | Excel | Download | Gantt chart with the critical path |
| Planning | Programme for MS Project | MS Project XML | Download | Opens in Microsoft Project |
| Planning | Resource Plan | Excel | Download | Manpower and plant histograms, materials call-off |
| Planning | Resource Plan | Word | Generate | The resource plan as a Word report |
| Planning | Organisation Chart | PowerPoint | Generate | Key personnel and who reports to whom |
| Planning | Detailed Work Programme | Word | Generate | Technical submission of the programme: planning basis, WBS, calendar, activity codes, milestones, weightage, productivity, work sequence, assumptions and more |
| Planning | Construction Method Statement | Word | Generate | Tender technical proposal: document control and basis, project understanding and overall methodology and more |
| Planning | Proposed Key Personnel | Excel | Download | The bid's key people, head office and site: qualification, experience, proposed position, nationality, present employment, past projects |
| Planning | Proposed Plant and Equipment | Excel | Download | The bid's plant with the organisation's own units from the Equipment Register (serial number, model, status, condition), the rest to be hired |
| Planning | Manpower Man-Month Tabulation | Excel | Download | Each key role, the people in every month of the programme and the total man-months, with the manpower curve |
| Planning | Organisation Chart (Excel) | Excel | Download | Head office and site organisation: every role with the person proposed from Key Staff |
| Planning | Manpower Schedule and Histogram | Excel | Generate | Management, engineers, supervisors, skilled workers, operators and general workers over the programme |
| Planning | Plant and Machinery Schedule and Histogram | Excel | Generate | Equipment type, number, deployment period and work area over the programme |
| Planning | Site Visit Report | Excel | Download | Who attended, certificate, access, ground, utilities, existing structures and risks |
| Planning | Technical Proposal Sections | Excel | Download | The sections of the technical proposal with owner, status and score |
| Quality and Safety | Inspection and Test Plan | Excel | Download | Hold, witness and review points |
| Quality and Safety | Testing Schedule | Excel | Download | Tests, frequencies and standards |
| Quality and Safety | HIRARC | Excel | Download | Hazards, risk scores and controls |
| Quality and Safety | Project Quality Plan | Word | Generate | Quality plan for submission: project information, quality objectives, organisation, resources, inspection and testing, method statements and ITP |
| Quality and Safety | HSSE Plan | Word | Generate | Health, Safety, Security and Environment plan for submission: objectives, organisation, major hazards and HIRARC, site rules and more |
| Quality and Safety | QA/QC Requirement and Risk Register | Excel | Generate | Unusual or stringent quality requirements with the specification reference and the control action |
| Quality and Safety | Tender HSE Compliance Checklist | Excel | Generate | Mandatory plans, personnel, permits, procedures, reporting and training the tender requires |
| Quality and Safety | Activity-Based Safety Methods | Word | Generate | Safety method and control measures for lifting, excavation, piling, marine works, work at height and traffic |
Report Questions
How many reports can AiTenderBid produce?
What is the difference between Download and Generate?
Can reports be in Chinese?
Can I use my own company templates?
How do I get several reports at once?
What is in the priced BQ export?
Price Your Next Tender with an AI Bid Team
Upload one tender folder, type /prepare-bid and compare the priced bill with your own. Or book a demo first.